Job Safety Analysis
Every task is broken down and assessed before work starts. The JSA is signed by the crew performing it, not filed by an office.

Everyone who arrives on a FieldMan site goes home in the same condition. That is the standard the rest of the programme is built around.
Industrial construction carries real hazards: work at height, hot work beside flammable materials, energised equipment, confined spaces and heavy lifts — often all in a plant that is still producing. FieldMan treats the control of those hazards as part of the engineering, not as paperwork produced afterwards.
Every scope we price includes the access, isolation, barricading and supervision needed to do it safely. If a job cannot be done safely in the window offered, we say so before we sign, rather than discovering it at two in the morning during a shutdown.


These are not aspirations — they are the controls your site supervisor will see applied from day one of mobilisation.
Every task is broken down and assessed before work starts. The JSA is signed by the crew performing it, not filed by an office.
Hot work, confined space, work at height, excavation and electrical isolation each run under a permit issued and closed by an authorised person.
Short daily briefings covering the day's hazards, the method, and the emergency arrangements for that specific work front.
Helmets, safety footwear, eye and hearing protection, harnesses and flame-retardant clothing supplied and enforced — including for visitors.
Erected by trained scaffolders, tagged, and inspected before each shift. No improvised access platforms, ever.
Every crane lift runs to a written plan: load calculation, ground bearing, exclusion zone, rigging inspection and a nominated signaller.
Welders, riggers, electricians and scaffolders work to documented qualifications, with records available for client audit.
Waste segregation, spill kits at fuel and oil points, dust and noise suppression, and removal of all construction debris at handover.
Safety and quality come from the same discipline: doing the work to a written method and recording that you did. Our QA/QC process runs alongside HSE on every project.


Health, Safety & Environmental (HSE) Policy — the full policy is set out below. A signed copy is available on request as part of vendor pre-qualification.
Fieldman Solution is committed to conducting all engineering, procurement, fabrication, construction, installation, commissioning, maintenance, and project management activities in a manner that protects the health and safety of our employees, contractors, clients, visitors, and the public, while minimizing our impact on the environment.
We recognize that Health, Safety and Environmental protection are fundamental responsibilities and integral parts of our business operations. No project, schedule, or commercial objective shall take priority over the safety of people and protection of the environment.
Fieldman Solution is committed to achieving a workplace where zero accidents, injuries, occupational illnesses, environmental incidents, and unsafe practices are actively pursued through effective planning, risk management, training, supervision, and continuous improvement.
Fieldman Solution shall:
Fieldman Solution is committed to protecting the physical and occupational health of all personnel involved in our activities. Our safety practices include:
Fieldman Solution recognizes its responsibility to protect the environment throughout the project lifecycle. We shall strive to:
Fieldman Solution considers competent personnel essential to safe project execution. Accordingly, we will provide appropriate:
Personnel shall only be assigned tasks for which they are appropriately trained, competent, and authorized.
All contractors and subcontractors working under Fieldman Solution shall be required to comply with applicable HSE requirements. Their performance shall be monitored through:
All accidents, injuries, near misses, property damage incidents, environmental incidents, and unsafe conditions shall be reported promptly.
Fieldman Solution will investigate significant incidents to determine root causes and contributing factors and implement corrective and preventive actions to reduce the possibility of recurrence.
Fieldman Solution shall maintain appropriate emergency preparedness arrangements based on the nature and risk profile of each project. Emergency planning may include response procedures for:
Emergency procedures shall be communicated to relevant personnel and periodically reviewed and tested where appropriate.
Fieldman Solution is committed to continually improving its HSE performance through:
Our goal is to develop a strong safety culture in which every individual takes personal responsibility for their own safety and the safety of others.
Management of Fieldman Solution shall provide the necessary leadership, resources, personnel, training, equipment, and supervision required to implement this policy effectively.
Every employee, contractor, and project team member is responsible for complying with HSE requirements and contributing to a safe and environmentally responsible workplace.
This HSE Policy shall be communicated to all relevant employees and stakeholders and shall be periodically reviewed and updated to ensure its continuing suitability, effectiveness, and alignment with applicable legal, client, and project requirements.

We are happy to submit our safety documentation, training records and method statements as part of your vendor pre-qualification.